Skip to content
NODUS

Specs library · AI compute

GPU Platforms

Published platform specifications for the GPU systems and rack-scale compute we secure for data-centre programmes.

BrandPlatformForm factorGPUs per systemMemory per GPUSystem memoryInterconnectPower (reference)Cooling
NVIDIAGB300 NVL72Rack-scale72 GPUs + 36 Grace CPUs288 GB HBM3e~20 TBNVLink 1.8 TB/s per GPUup to 142 kW per rackLiquid
NVIDIAGB200 NVL72Rack-scale72 GPUs + 36 Grace CPUs—13.4 TBNVLink 1.8 TB/s per GPU—Liquid
NVIDIAHGX B3008-GPU server8up to 288 GB HBM3e2.1 TBNVLink 1.8 TB/s~14 kW (DGX B300 reference)Air or liquid (by integrator)
NVIDIAHGX B2008-GPU server8~180 GB HBM3e1.4 TBNVLink 1.8 TB/s~14.3 kW (DGX B200 reference)Air or liquid
NVIDIAHGX H2008-GPU server8141 GB HBM3e~1.1 TBNVLink 900 GB/sup to 700 W per GPUAir or liquid
NVIDIAHGX H1008-GPU server880 GB HBM3640 GBNVLink 900 GB/sup to 700 W per GPUAir or liquid
NVIDIAH200 NVLPCIe serverup to 8141 GB—NVLink bridge 900 GB/sup to 600 W per GPUAir
NVIDIARTX PRO 6000 Blackwell Server EditionPCIe serverup to 896 GB GDDR7—PCIe Gen5up to 600 W per GPUAir or liquid
NVIDIAL40SPCIe serverup to 848 GB GDDR6—PCIe350 W per GPUAir
AMDInstinct MI355X8-GPU OAM8288 GB HBM3E2.3 TBInfinity Fabric1,400 W per GPULiquid
AMDInstinct MI350X8-GPU OAM8288 GB HBM3E~2.3 TBInfinity Fabric1,000 W per GPUAir
AMDInstinct MI325X8-GPU OAM8256 GB HBM3E2 TBInfinity Fabric1,000 W per GPUAir
AMDInstinct MI300X8-GPU OAM8192 GB HBM31.5 TBInfinity Fabric750 W per GPUAir

Sources: NVIDIA GB300 NVL72 · NVIDIA HGX · NVIDIA H200 · AMD Instinct MI355X

02 / WHICH ONE DO I NEED?

Which one do I need?

Frontier training at scale

→ GB300 NVL72 (needs liquid cooling and 130 kW+ racks).

Training and fine-tuning in standard data halls

→ HGX B300 / B200.

Proven platform, easier to power

→ HGX H200 / H100.

Inference and mixed workloads

→ H200 NVL, RTX PRO 6000, L40S.

AMD alternative

→ Instinct MI355X / MI350X.

03 / WHAT WE NEED FROM YOU

What we need from you

Configuration (GPU, CPU, RAM, storage, NICs), networking (InfiniBand or Ethernet, optics included?), cooling, quantity, delivery site and date, and end user (for export compliance).

AI compute is export-controlled. We confirm the end user and destination on every deal, and do not supply prohibited destinations or end users.

Submit a requirement ↗