
Developers & operators · Procurement
Long-Lead Power and Compute, Secured Against Your Energisation Date
On-site gas generation and GPU allocation for data-centre programmes, sourced through OEM-authorised channels and direct asset owners, and verified before it reaches your team.
On-site, prime and bridge-to-grid power
Gas reciprocating gensets and gas turbines for prime, continuous and bridge-to-grid duty, for sites awaiting interconnection or operating behind the meter. 50 Hz and 60 Hz; new-build slots, zero-hour and verified used units.
Specification inputs
- Site and critical IT load (MW)
- Frequency and voltage
- Fuel specification and gas pressure
- Redundancy topology (N+1, 2N)
- Design ambient and altitude
- Required-on-site date


GPU capacity and AI systems
Reserved and dedicated GPU clusters from screened operators, and hardware allocation from 8-GPU systems to rack-scale, liquid-cooled NVL72 deployments, for neoclouds, AI labs and enterprise AI programmes. Every compute transaction is subject to end-user, end-use and export-control review.
Specification inputs
- Platform and quantity
- System configuration and fabric (InfiniBand or Ethernet)
- Cooling (air or direct-to-chip liquid)
- Rack power density
- Delivery site and window
- End user
Execution process
- 1
Brief
Site, critical IT load, specification and required-on-site date.
- 2
Qualify
Principal, site control and programme timeline confirmed.
- 3
Source
Requirement placed with OEM-authorised channels and direct owners in our network.
- 4
Verify
Provenance, serial numbers, title, OEM authorisation and test records validated.
- 5
Introduce
Executed NDA, then a direct introduction to principals.
Governance built in
- KYC and KYB
- On every counterparty, including directors and ultimate beneficial owners.
- Sanctions screening
- Across UK, EU, US, UN and UAE lists.
- Export controls
- End-user and end-use review on all compute, including third-country diversion.
- Settlement
- Via escrow or documentary letter of credit.
Submit a requirement
Specify the site, critical IT load and required-on-site date. We respond within one working day.